Hughes and Salvidge offer specialist experience and expertise in airport demolition and dismantling strip-outs.

We have been engaged in airport projects since the early 1990s and are fully conversant with airport protocol:

  • Acting as Principal Contractor (CDM) – complete project control during the demolition phase
  • Strategic planning advice – all stakeholders fully informed through early engagement
  • Budget costing
  • Programme advice and methodology
  • Logistics management
  • Preparation and enabling works
  • Asbestos removal
  • In-house authorised pass signatory for restricted areas
  • GSAT trained and passed

What our clients say

“Balfour Beatty has worked with Hughes and Salvidge for over ten years at Heathrow Airport. During that time Hughes and Salvidge has carried out many projects of varying complexity, from the truncation of Pier 3 in a heavily trafficked operational area in close proximity to Aircraft to the technically challenging deconstruction of T1 Europier. Hughes and Salvidge also completed the demolition of the Old Control Tower, which has many constraints that were critical to Heathrow’s existing infrastructure. There are many more projects and in all the works they carried out for us they have acted in an exemplary manner, with safety being at the top of their agenda. We choose them because of their technical expertise together with their personnel, with whom we have great trust. They are the best, safest and technically competent demolition contractors that I have worked with in my 30 years’ experience.” – Balfour Beatty – Keith Cannin