Working on chemical plants or associated projects is a niche sector that Hughes and Salvidge have developed extensive experience in over the last 10 years. We can provide solutions for various-sized facilities and can navigate complex issues that arise due to the nature of chemical demolition. 

We have the depth of knowledge and expertise in collaborating with chemical clients in their complex and sensitive facilities, to ensure any demolition project in such a surrounding is conducted with the utmost respect for safety and the environment.

Our Chemical Demolition Projects

 

Hughes and Salvidge were appointed as Principal Contractor for the decommissioning and demolition of the 54-acre site, which in part remained live during our demolition works.

The scope of work included the removal and disposal of all asbestos from all disinvestment zones, all process and storage equipment, all buildings and structural steelwork, and all above ground concrete structures were then demolished. Stairways, columns, beams, pipe tracks/bridges, pipe supports, bund walls and RFC frames were also dismantled before the cleaning, removal and disposal of all tanks and vessels.

 

 

Versalis chemical plant in Hythe

Chemical demolition of Total Stalybridge plant

 

We also completed a key demolition project for Total at their Stalybridge petrochemical plant. The works comprised of the asbestos sheeting removal, demolition, dismantling and site clearance of the redundant buildings, structures and associated equipment of a manufacturing plant, offices and laboratory buildings. Also included within the demolition scope were the associated utilities equipment, including switch rooms, transformers and cooling tower.

The facility was located within an industrial zone in Stalybridge with a canal and a river in close proximity. An adjoining business and a main road running alongside the estate were other factors we needed to consider as we carefully planned and managed the project with the safety of all parties of paramount importance.

Hughes and Salvidge completed the decommissioning and demolition of the Clariant UK chemical production facility in Pontypridd.

The main works consisted of decontamination works before the demolition began. Demolition involved the removal of plant and equipment from structures and the demolition down to solid ground floor slab level.

 

 

Demolition of Clariant UK chemical facility